Does the EWR Co. Option E Decision meet its Own Assessment Criteria?

The EWR Co. assessment is based on these 4 principles taken from page 7 of their document Connecting Communities: The Preferred Route Option between Bedford and Cambridge Executive Summary: “• Creating connections: not just laying down steel and concrete, we are focused on designing a railway that is most likely to create connections between local communities … Continue reading Does the EWR Co. Option E Decision meet its Own Assessment Criteria?